Client & Owner: | Water and Power Development Authority (WAPDA) |
Description of Works: | Embankment of the existing lake (8,000 ft above sea level) to create a reservoir for irrigation, water supply, and power generation. Construction of Civil Works & Hydraulic Steel Works for the Dam & Powerhouse comprising, Dam, Spillway, Coffer Dam, Intake Structures, Box & Circular Conduits, Control Tower & Stilling Basin, Two Power Houses, Headrace, Fore Bay, Spill Channel, Penstocks, Gates, Trash Racks, and Stop Logs. |
1. MAIN COMPONENTS | |
a) Dam (Type: Earth Fill): | Height: 128 Ft. Length: 650 Ft. Top Width: 30 Ft. |
b) Spillway: | Length: 1,075 Ft. Width: 50 Ft. |
c) Command Area: | Left Bank Canal: 8,119 Acres Right Bank Canal: 2,012 Acres CCA: 10,131 Acres |
d) Length: | Left Bank Canal: 59,000 Ft. Right Bank Canal: 30,000 Ft. |
Man-hours: | 2.4 million |
Peak manpower: | 450 |
Completion: | September 2006 |