Mangla Dam Raising Project Construction of Water Treatment Plant for New City





Client: Water and Power Development Authority, Pakistan
Owner: WAPDA
Location: Pakistan
Description of Works: Construction of Water Treatment Plant for New City on EPC Basis. Scope of Work includes the following:
  • Cascade Aerators with Control Value and Flow Metering.
  • Rapid Gravity Sand Filters and experimental Anthracite to Filter Bed, complete with all Piping, Valves and Fittings, Filter Nozzles, False Filter Bottoms, Filter Media and Control Consoles for Auto-Operation of Filter Valves.
  • Machine House complete with Back Wash Pumps, Air Blowers and Overhead Traveling Crane
  • Complete Plant Water Supply System with all Piping and Fittings
  • Instrument Air System with all Piping and Fittings
  • Chemical House with all the equipment for Preparation and Dozing of Lime
  • Chlorination House equipped with Dozing Facility of Chorine, Booster Pumps, Valves and Fittings.
  • Complete Laboratory and Testing Equipment
  • Instrumentation and On-line Monitoring of Water Quality and Flow.
  • Electrification, Painting and / or Repainting of all Exposed Parts.
  • Setting to Work, Excavation and Backfilling.
  • Construction of all the Civil Works of the Plant including Internal Roads and Drainage System.
Man-hours: 0.53 million
Peak Labour Force: 160
Completion: October, 2007